High-voltage transmission network at sunset
CurvatureEnergy · Zug, Switzerland

A BESS project developer in Switzerland, focused on
disciplined project execution.

CurvatureEnergy is a grid-scale battery storage developer based in Zug, Switzerland. We originate and develop grid-scale and behind-the-meter battery energy storage system (BESS) projects, working from site screening through grid connection, land, permitting and commercial structuring to ready-to-build (RTB).

What we do

Battery storage development,
with a defined route forward.

CurvatureEnergy originates projects and coordinates the technical, land, grid, permitting and commercial workstreams required to move selected sites towards implementation.

— 01

Grid-scale BESS

We identify and screen locations, initiate grid enquiries, assess land and planning constraints and structure a staged development programme towards RTB.

Project development
— 02

Industrial BESS

We assess load data, tariffs, PV generation, available space and grid conditions, then define the BESS configuration and commercial structure for the site.

Industrial sites
— 03

Financing and operation

Where the site and contract support the model, CurvatureEnergy finances, builds, owns and operates the BESS, with savings shared under agreed measurement and settlement terms.

Discuss a site
Development discipline

How CurvatureEnergy
works.

Each project is advanced through documented decisions. Screening outputs, verified facts, assumptions and outstanding third-party responses remain distinct.

01
Originate
02
Validate
03
Secure
04
Advance to RTB
— Evidence before assertion

Document what is known

We separate source documents and counterparty responses from working assumptions and items that remain to be confirmed.

— Risk in sequence

Resolve the next constraint

Grid, land, planning and technical questions are addressed in a deliberate sequence before further resources are committed.

— Clear interfaces

Define responsibilities

Project owners, site hosts, network operators, authorities and delivery partners need a clear scope, decision path and record of dependencies.

Development evidence

Methods shown
in practice.

Our case studies describe the work performed and the status reached. They do not present screening candidates as secured projects or preliminary analysis as an approval.

— Grid-scale development

From nationwide screening to a network enquiry

An anonymised case study showing how a Swiss candidate moved from geospatial screening into site-specific grid review.

Read the case study
— Industrial development

Structuring BESS with on-site PV

An anonymised development analysis covering site demand, PV integration, BESS sizing and the commercial interface.

Read the case study
— Technical literacy

Regulatory and market analysis

Source-led analysis of Swiss grid costs, tariffs, frequency services, hydropower interaction and project-development requirements.

Explore Insights
Start a conversation

A site, project or
development mandate?

Share the available site, grid, land or operating information. CurvatureEnergy will identify the appropriate first development step.

Contact CurvatureEnergy